Ground works have now been completed in the area between the beach access gate and the area leading to the beach, adjacent to the under bar balcony area.

Groundworks11

GroundworksA3

This work has greatly improve the dinghy wash-down area, making beach access, launching, and recovery more efficient with extra dinghy wash-down points and drains with silt-traps.

This will speed up the launching/recovery process and will hopefully result in less sand in our showrooms and reduce the occurance of blocked drains!

 

  • 1Groundworks
  • 2Groundworks
  • 3Groundworks
  • 4Groundworks
  • 5Groundworks
  • Groundworks
  • Groundworks10
  • Groundworks11
  • Groundworks12
  • Groundworks13
  • Groundworks14
  • Groundworks2
  • Groundworks3
  • Groundworks4
  • Groundworks5
  • Groundworks7
  • Groundworks8
  • Groundworks9
  • GroundworksA1
  • GroundworksA2
  • GroundworksA3
  • PHopen23
  • SgrechBach
  • ann
  • autumnseriesweb
  • commodore
  • cover2023
  • cruisers
  • davesharp
  • finally
  • finally1
  • flatly
  • isorateam
  • j70-2
  • jackknifeprize
  • joparty
  • lifetimeaward
  • mojitobach
  • mojitobach2
  • mojitopaul2
  • mojitoprize
  • sgrechprize
  • sharpie
  • stprize
  • stubarry
  • toptable

CalonHwylioCymru